| Derrick: | NOV DDBN; 210 ft x 80 ft x 60 ft; 1,250 st main & 750 st aux |
| Drawworks: | AHD-1250; 9,000 hp main / SSGD-750, 4,500 hp aux |
| Top Drive: | NOV TDX-1250; 150,000 ft-lbs @ 130 RPM fts |
| Rotary: | NOV Model RST-755; 75-1/2 in Main, NOV Model RST-605; 60-1/2 in Aux |
| Iron Roughneck: | NOV ST-160C; 140,000 / 160,000 ft-lbs. m/u / b/o torque |
| BOP: | NOV Shaffer NXT; 6 ram; 18-3/4 in x 15k psi |
| Motion Compensator: | NOV-CMC; 1,000 kips compensated/2,500 kips locked; 25 ft stroke and NOV Active Heave Drawworks |
| Riser Details: | NOV-Shaffer-FT-H; 133 joints 75 ft length |
| LMRP: | (2) NOV Shaffer SL 18-3/4 in x 10 psi annulars |
| Control System: | NOV Shaffer MUX System |
| Pipe Handling System: | NOV (2) HydraRacker-model HR-IV-ER w/ 30 kips lifting capacity |
| Solids Control: | (6) NOV-Brandt VMS-MS Shakers, NOV-Brandt-VMS-MS1 Mud Cleaner w/ sander and desilter capability |
| Diverter: | NOV-Shaffer-CSO; 75-1/2 in x 1,000 psi |
| Cranes: | (1) NOV - OC4475RCE 165T, (3) NOV - OC4000KCE 100 T |
| Mud Pumps: | (4) National 14-P-220; 2,200 HP |
| Engines: | (6) Himsen 16H32/40v w/8,000Kw per engine, W/6 generator with rating of 7,600Kw per generator at 0.8 power factor |
| Station Keeping: | Kongsberg DP3 K-Pos DP22 (Main) & DP12 (Backup) |
| Thrusters: | Rolls Royce (6) 5,000kw-DP3-fully retractable and maintainable Thruster |